The plasterwork is the work that clearly defines the transition from the construction stages to the beginning of the final stages in the construction of a house or renovation of an existing building.

The role of the plaster contractor

The role of the plaster contractor is important and crucial in the progress of the construction project. In the fact of the work of the plasterer, he notes that the construction phase of the building has been completed, the construction of the various infrastructures such as electricity, water, air conditioning, etc., has been completed, and Otto can begin the finishing works such as flooring, installation of sanitary tools, the assembly of windows – doors and more.

In every construction method and type of construction we need the work of the plasterer.
The main function of the plasterer is to straighten the walls of the house, both interior walls and exterior walls, and prepare them for the final painting, i.e. interior paint and outdoor schlicht.

Filter black plaster before hitting
Filter black plaster before hitting

Apply plaster to walls
Apply plaster to walls

Placing plaster on the walls of the building's shell
Placing plaster on the walls of the building's shell

Why do we need plaster?

That obviously sounds like a rhetorical question. The plaster is the basic cladding of the walls.
It's very easy to compare it to the human body.
The skeleton of the structure is the bones. It carries the weight of the structure and holds it from collapse.
The plaster is the muscles, which envelop the skeleton and protect it.
The color and the schlicht are the outer skin that envelops the structure system.

The purpose of the plaster in the building
Fusion and strengthening the skeleton – this is the main function of plaster. The plaster itself is done in several stages, designed to tie the walls together, and strengthen them. The materials from which the layers of the foundation and base for plaster are hardening and firming materials, which connect to the blocks and concrete, or alternatively to the cladding panels of the advanced construction.
Alignment of walls before the finishing works – Sometimes when the walls are built, curvatures, deviations and 'waves' are formed, and on the other hand, the various quarrying honors that are done in favor of installing pipes create 'wounds' in the skeleton. The plaster is designed to cover and straighten the wall before the final vote.
Correcting performance errors – often happens because there are changes to the project. Move a water spot, add more power outlets... The plaster, like concealer, came to cover all the repairs and modifications.
General cover of the shell outside the building – the schlicht is the exterior cover of the house. He seals the wall and paints it in the chosen shade.

Applying a linking element to schlicht
Applying a linking element to schlicht

Align black plaster with comb
Align black plaster with comb

Black plaster hitting
Black plaster hitting

    For more information and details, fill in the details on the form and get back to you as soon as possible

    What are the stages of the cover-up?

    We contract with the plaster contractor during the construction stages.
    We should not take the issue lightly, nor try to spare the plaster work or the quality of the materials.
    Once the plaster work has been done, it is very difficult to repair or change it.

    Stages of cover-up work
    Cleaning – At the beginning of the work, the walls must be cleaned of all the waste and residue on them. Waste of nails, tying irons, itching and ballet, exposed piping, etc.
    Foundation – On the exposed skeleton splatters that are already an element known as 'hitting'. This layer binds the plaster to the skeleton and strengthens it.
    Whitewashing and straightening black plaster : When the deposit layer dries, the main work of the plastering begins and is the application of the black plaster, including aligning the walls by rulers, combs and marking wires.
    Whitewashing and white plaster straightening : Inside the house, paint another cover-up layer called white plaster. There are different types of plasterers that are performed, and this is contingent on the room type (bedroom, bathroom, mmD).
    Basic (Primer) – This stage is done in plaster except as the basis for the final stage of applying the licht. The element is a material that connects the plaster with the schlicht, and it is made based on water or turpentine (depending on the type of schlicht selected). Wait until the foundation is dry before applying the licht
    Schlicht – This is the final stage of the cover-up work, in which we coat the shell of the building, and sometimes the interior of the building, in Schlicht according to the shade and level of density they have chosen.

    Apply external acrylic schlicht
    Apply external acrylic schlicht

    A team of plasterers smearing walls
    A team of plasterers smearing walls

    Service balcony covered in Schlicht
    Service balcony covered in Schlicht

    Materials and Responsibilities

    The black plaster at its base consists of concrete, which is mixed with various interconnecting materials.
    The white plaster consists of a plaster base, which is also reinforced with casting and adhesive materials.
    In our country there are companies that produce Licht. We choose the schlicht according to our preferred shade and density level – the roughness we want.

    Today there are finishing plasterers of different textures, including effects such as sparkle, polishing, nuclear and more. We will usually use these special plasterers inside the house as part of the interior design.

    It is important to remember that the work of the plasterer is otherwise the most important works, and for good reason it is said that when the plasterer begins his work, it must not be stopped until he is finished.
    Why? Because when preparing the plaster, the materials used have limited stay and crystallization time, and the plasterer must complete his work according to this time. If the plasterer started his work and did not finish it, he must dismantle the work and start it from the beginning.
    If he has not done so there is a great chance that stains or cracks will form in plaster.

    House after black plaster

    If a house is built using an advanced construction method, the plaster work must be adapted to the construction method, and materials adapted to the construction materials must be used.

    More articles on similar topics

    Sealing contractor
    Certified Surveyor
    10 ways to choose an architect
    Project Manager or Supervisor
    Concrete castings

    You are welcome to contact me at 050-9847484
    Or write to me directly from here.

    wwww.efratmeiri.co.il

      For more information and details, fill in the details on the form and get back to you as soon as possible

      Did you like it? Share!

      Comments on Facebook

      Comments on Facebook

      4 thoughts on "various consultants – plaster contractor"

      Write a response

      Consult me Skip to content