Permits

PermitsAny building, whether it is a residential home, a warehouse or a bicycle shed, requires a building permit.

If this is not the case with you and it is important to you for your mental security – I believe that in a few moments
You'll be clear what your next move should be.

The Planning and Construction Law requires us to ensure that each property or part of a building is planned, built and registered legally.

Building permit law for a new building lawfully permits construction permit for an existing building

Whether it'sdesigning new private homes or an existing illegal building,
It is mandatory to obtain an orderly building permit for the building.

Any building, wherever it is, no matter who owns it (including the Israel Lands Administration) must obtain a building permit.

When I plan a new home, part of the planning process includes submitting an orderly application for a building permit before construction.

For existing and illegal structures, the procedure is called legalization.

Legalization: the licensing process of illegal construction and its transformation into one

How can the situation be corrected?
By applying for a legal building permit for an illegal structure.
Each case of licensing a construction exception is different from its predecessor, and for the most part, solutions can be found for each case.
But it's not a simple procedure, and certainly not fast or short.
Law enforcement does not take lightly in these cases and most of them threaten a financial fine, demolition order or subpoena.
Due to the construction irregularities that exist in the property, there is a strict adherence to the engineering department of the municipality or the planning committee on
How to manage and approve the repeated application for a building permit – for the legalization of the structure.

There are cases called limited work : these are cases of construction irregularities or of a request for specific construction additions such as
Placing an antenna on the roof, adding a water heater, installing a photovoltaic system or wind turbine, building a fence, etc.
These cases are conducted relatively easily in committees, and according to precise guidelines.

Here's how I can help you get a building permit:

  • I study each house and property on its own merits, as well as the built-up plans that apply on the field.
  • I perform various tests that allow me to examine the appropriate courses of action for the property.
  • I'm formulating an action plan in which a legal and sensible arrangement can be created that is acceptable to the engineering department, and has minimal, if any, harm to you.
  • I'm handling all bureaucratic procedures with the authorities in your place until you get a building permit.
  • Bottom line, I can save you the headache, the time and the frustration involved in running a case and a procedure that you don't know about.
    Sometimes it is not only complex it is also ineffective to try to do it alone.

If you're missing details or it's right for you to make a decision and make a move, I'm on the phone: 050-9847484 or 077-7020014
Violin 3, Karkur
Contact us to arrange a consultation meeting

wwww.efratmeiri.co.il

    For more information and details, fill in the details on the form and get back to you as soon as possible

    Did you like it? Share!
    Consult me Skip to content